Tuan Loc Construction Investment Corporation

Environment

Environmental information

Nhon Trach 6 Industrial Park publishes its complete environmental documentation, including approved permits and procedures, environmental protection reports and regulations, and periodic waste analysis results.

Updated quarterlyUpdated monthlyLast updated: July 2026Documents can be downloaded directly, with no registration required.

Introduction

Nhon Trach 6 Industrial Park publishes its complete environmental documentation, including approved permits and procedures, environmental protection reports and regulations, and periodic waste analysis results.

Wastewater and emissions monitoring results are updated quarterly; water supply test results are updated monthly. All documents are published as PDF files and can be downloaded directly, with no registration required.

Environmental permits & approvals

  • 6308/BNNMT-MTNotice of inspection results for the trial operation of the waste treatment facilities of “Nhon Trach VI Industrial Park”

    16/06/2026 · Ministry of Agriculture and Environment

    PDF · 1,7 MB · Download
  • 220/GPMT-BNNMTEnvironmental licence

    25/06/2025 · Ministry of Agriculture and Environment

    PDF · 2,4 MB · Download
  • 2650/QĐ-BTNMTDecision approving the environmental impact assessment report for the project “Adjustment of the infrastructure of Nhon Trach VI Industrial Park” – three sludge dryers rated 1.65 tonnes/hour each and one boiler rated 20 tonnes of steam/hour

    24/11/2020 · Ministry of Natural Resources and Environment

    PDF · 1,6 MB · Download
  • 2965/QĐ-BTNMTDecision approving the environmental impact assessment report for the project “Adjustment of the infrastructure of Nhon Trach VI Industrial Park”

    20/11/2015 · Ministry of Natural Resources and Environment

    PDF · 2,7 MB · Download

Reports & regulations

  • 51/QĐ-NT6AEnvironmental protection regulations of Nhon Trach 6 Industrial Park

    31/05/2022 · Nhon Trach 6A Investment Construction Industrial Zones Co., Ltd

    PDF · 6,6 MB · Download
  • Environmental incident prevention, response and remediation plan for Nhon Trach 6 Industrial Park – 2025

    2025

    PDF · 1,1 MB · Download
  • Waste incident prevention and response plan for Nhon Trach 6 Industrial Park – 2025

    2025

    PDF · 1,5 MB · Download

Waste monitoring results

Updated quarterly

Each quarter comprises three test reports: treated wastewater, boiler emissions and sludge dryer emissions.

2026

Q2 2026

Q1 2026

Water supply quality

Updated monthly

Samples taken at the inlet valve of Ho Cau Moi Water Supply JSC – the source serving Nhon Trach 6 Industrial Park.

2026